Key points
- The quality of the result is made in the preparation: cleaning, filling holes, sanding and removing dust.
- Use primer on new filler and new surfaces, or when going from a dark colour to a light one.
- Two thin coats are better than one thick coat, respecting the drying time on the can.
- US EPA: increase ventilation when using products that emit volatile organic compounds, and follow the label precautions.
What you need
Tools
- Paint roller with handle and tray
- 5–7 cm cutting-in brush
- Filling knife
- Fine sandpaper
- Masking tape
- Plastic sheet or drop cloth for floor and furniture
- Stepladder
- Glasses and dust mask for sanding
Materials
- Interior paint in the right colour and sheen
- Wall filler for cracks and holes
- Primer where needed
Before you start, read the guide to paint types and sheens to choose the right paint, and the safety guide for using a ladder safely.
1) Choose the paint and work out the quantity
- Sheen: flat/matt hides wall imperfections and suits ceilings; higher sheens are easier to clean and suit hallways, high-traffic walls and kitchens1.
- Quantity: use the paint calculator, and take the coverage rate from the can of the product itself, as it varies from paint to paint.
- Low VOC: choose a low-VOC paint for closed rooms. See the paint guide.
2) Preparation (the most important stage)
- Empty the room or move furniture to the middle and cover it, and cover the floor.
- Switch off the circuit if you will remove switch and socket plates, then remove them and keep the screws in a bag.
- Clean the walls of dust and grease (especially near the kitchen and light switches) and let them dry.
- Fill holes and cracks with filler using the filling knife, and let it dry as the product instructs.
- Sand the dry filler flush with the wall, then wipe off the dust.
- Apply masking tape along ceiling edges, skirting boards, doors and windows.
- Primer: apply it over filler and new surfaces, and over the whole wall if you are going from a dark colour to a light one.
3) Painting
- Start with the ceiling if it is being painted, then the walls.
- Cutting in: brush a 5–7 cm band along corners, edges and around switches.
- Rolling: load the roller without dripping, paint the wall in sections about a metre wide with overlapping top-to-bottom passes, and blend each section into the previous one while still wet to avoid lap marks.
- Second coat: after the drying time printed on the can.
- Remove the tape at an angle after the last coat, before the paint fully hardens on the tape.
4) Ventilation and leftovers
The US Environmental Protection Agency recommends2:
- Increasing ventilation when using products that emit volatile organic compounds, and meeting or exceeding label precautions.
- Buying limited quantities of products used only occasionally, such as paints.
- Disposing of old, partly full containers safely, not with regular rubbish.
In practice: open windows and run an exhaust fan blowing outwards while painting and afterwards, and preferably nobody sleeps in the room until the smell has gone.
5) Cleaning up
- Water-based (acrylic) paints: wash tools with soap and water straight away.
- Oil-based paints: need a solvent (thinner) as the product instructs, with ventilation.
- Keep a small amount of paint in a sealed can labelled with the colour and room for future touch-ups.
Sources
The number next to a statement points to its source in this list. Sources back the general information; anything marked “practical advice” is editorial experience, not a quoted source. Anything that affects safety, structural design or electrical installations needs a licensed professional, and in Saudi Arabia the binding reference is the Saudi Building Code.
- 1How to Choose a Paint Finish — Benjamin Moore
- 2Volatile Organic Compounds' Impact on Indoor Air Quality — U.S. Environmental Protection Agency (EPA)