Key points

  • ISO 10508 divides plastic water systems into application classes; class 1 for 60°C hot water and class 2 for 70°C, with a 50-year design life.
  • PPR (ISO 15874) is common for cold and hot water and is joined by heat fusion.
  • CPVC to ASTM D2846 is designed for hot and cold water up to 82°C.
  • PVC-U pressure pipe to ISO 1452 is for cold water (up to 25°C, and up to 45°C with pressure derating), not for hot water lines.
Written for:OwnerContractorSupplier

The choice of pipe is a decision that lives with you for decades inside the walls. The most common mistake we see: a pipe meant for cold water used on a hot line, failing after a few years. This guide explains the differences using international standards.

1) First: what is an "application class"?

The international standard ISO 10508 sets a classification of service conditions for plastic pressure piping for hot and cold water, for a 50-year design life1. It defines three temperatures:

  • TD — design temperature: the temperature the system is designed to run at.
  • Tmax — maximum temperature: occurs for short periods only.
  • Tmal — malfunction temperature: the highest temperature that may be reached when controls fail (e.g. a heater thermostat failure), allowed for up to 100 hours in 50 years1.
ClassTDTmaxTmalTypical application
160°C (49 yrs)80°C (1 yr)95°C (100 h)Hot water supply at 60°C
270°C (49 yrs)80°C (1 yr)95°C (100 h)Hot water supply at 70°C
420/40/60°C70°C100°CUnderfloor and low-temperature radiator heating
520/60/80°C90°C100°CHigh-temperature radiator heating

Source: Table 1 of ISO 10508:20061. The standard also states that any system meeting one of these classes must be suitable for conveying cold water for 50 years at 20°C and a design pressure of 10 bar, and that all materials in contact with drinking water up to 80°C must pose no health risk1.

How to use this: when buying hot water pipe, ask the supplier for the application class and design pressure printed on the pipe or its certificate (e.g. "Class 2 / 10 bar"), not just "heat-resistant".

2) PPR (polypropylene) pipes

  • Standard: the ISO 15874 series for hot and cold water installations inside buildings, for domestic and heating systems within the application classes2.
  • Joining: heat fusion (pipe and fitting are heated and fused), forming a homogeneous joint.
  • PN rating: you'll see PN10, PN16 or PN20; the number is the nominal pressure in bar at 20°C. Hot water lines need a higher rating; refer to the manufacturer's tables relating temperature to allowable pressure.
  • Note: plastic pipes expand more with heat than metal; exposed hot lines need supports allowing movement per the manufacturer.

3) PEX (cross-linked polyethylene) pipes

  • Flexible and often run as one length from a manifold to each outlet, reducing hidden joints in walls.
  • Joined with mechanical fittings (compression/rings) depending on the system.
  • Its international standard is in the same ISO 10508 framework (the ISO 15875 series), and the application class is checked as for PPR.
  • Multilayer versions (PEX-AL-PEX) with an aluminium layer reduce expansion and hold their shape when bent.

4) CPVC (chlorinated PVC) pipes

  • ASTM D2846 covers CPVC hot and cold water distribution systems up to 82°C (180°F)3.
  • Joined with a solvent cement made for CPVC; don't use ordinary PVC cement.
  • Pressure capacity falls as temperature rises; follow the manufacturer's tables.

5) PVC-U (ordinary unplasticised PVC) pipes

  • ISO 1452 for PVC-U pressure pipes covers water supply up to 25°C (cold water), usable up to 45°C with pressure derating factors4.
  • So it is not used for hot water lines.
  • Its most common use in homes: drain pipes (made to different drainage standards from pressure pipes), and main cold supply lines depending on the design.

6) Other types you'll hear about

  • HDPE (high-density polyethylene): common for buried mains and network connections.
  • Copper: metallic, withstands high temperatures, more expensive, needs specialised brazing/soldering.
  • Galvanised steel: found in older homes; over time it corrodes internally, reducing pressure and discolouring water, so it's usually replaced in full renovations.

7) Quick comparison

TypeHot water?JoiningReference
PPRYes, per application class and PN ratingHeat fusionISO 15874
PEX / PEX-AL-PEXYes, per application classMechanical fittingsISO 15875
CPVCYes, up to 82°CSpecial solvent cementASTM D2846
PVC-U (pressure)No — cold waterSolvent cement / rubber ringsISO 1452

8) In Saudi Arabia

Design and installation of plumbing in buildings is governed by the Saudi Plumbing Code SBC 701, which covers installation, alteration, repair, replacement and maintenance of plumbing systems and materials5. Make sure the pipes used comply with locally approved standards and that installation is supervised by a specialist.

9) The water path from source to point of use

A typical path in homes with tanks; order, sizes and pressure are set by the design and operating conditions, not a general rule.

StageWhat matters to the ownerDetails
1. MeterA reading before and after two hours of no use reveals leaks6leak detection
2. Ground tankA tight cover, and cleaning and disinfection when needed7water tanks
3. PumpFrequent cycling with no use signals a leakplumbing problems
4. Roof tank or pressurised systemPressure suited to the fixtures per the design—
5. Internal networkPipe type and service class for cold and hot water (sections above)—
6. Water heaterTemperature setting and safetywater heaters
7. Valves and points of useA valve at each point, and water-saving tapsbasins and toilets

Tips when renovating

  1. Don't mix different systems without dedicated transition fittings.
  2. Pressure-test the network before closing walls, and document pipe routes with photos and measurements.
  3. Fit branch valves for each bathroom and kitchen to ease maintenance.
  4. Insulate long hot water lines to reduce heat loss.

Sources

The number next to a statement points to its source in this list. Sources back the general information; anything marked “practical advice” is editorial experience, not a quoted source. Anything that affects safety, structural design or electrical installations needs a licensed professional, and in Saudi Arabia the binding reference is the Saudi Building Code.

  1. 1ISO 10508:2006 — Plastics piping systems for hot and cold water installations — Guidance for classification and design — ISO — copy published via iTeh Standards
  2. 2ISO 15874-2 — Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 2: Pipes — International Organization for Standardization (ISO)
  3. 3ASTM D2846/D2846M — CPVC Plastic Hot- and Cold-Water Distribution Systems — ASTM International
  4. 4ISO 1452-2 — PVC-U pipes for water supply and drainage under pressure — International Organization for Standardization (ISO)
  5. 5Saudi Plumbing Code SBC 701 (2024) — Saudi Building Code National Committee
  6. 6Fix a Leak Week — How to check for leaks (meter test, toilet dye test) — U.S. EPA — WaterSense
  7. 7Technical Note 3: Cleaning and disinfecting water storage tanks and tankers — World Health Organization (WHO) / WEDC
Was this guide useful?
This guide is for general information and planning, based on standards and technical guides. Standards are revised periodically; in Saudi Arabia the binding reference is the Saudi Building Code and the instructions of the competent authorities. For design and execution, use a licensed engineer or technician. Found an error? Tell us.