Key points

  • Before pouring: ask the supervisor to sign off the rebar (grade, size, number, spacing and cover) against the drawings, and photograph it.
  • No water is added to concrete on site; excess water is a main cause of cracking.
  • Curing (wetting or covering) for 7 days at 10°C or above under the ACI 318 code, as summarised by the FHWA.
  • Waterproofing under tiles is flood-tested before tiling, and adhesive coverage is at least 80% indoors and 95% in showers and exterior areas.
Written for:OwnerContractor

The supervising engineer is technically responsible for sign-off. But an owner who knows what to ask and when prevents many mistakes. This list does not make you an approval body; it helps you ask for the evidence (photo, record, certificate) at the right time.

General rule (practical advice): anything that will be covered later (rebar, services, waterproofing) is photographed and signed off before it is covered. After that, inspection means demolition.

1) Checkpoints by stage

StageWhat to watch or requestDetails
Excavation and soilThe soil report, excavation level matching the design, and no standing water before the blinding poursoil and foundations
Rebar before pouringGrade (in ASTM A615, for example, Grade 40 [280], 60 [420], 80 [550] and 100 [690])1, size, number and spacing are set by the structural engineer and not substituted without approval, plus the concrete cover (spacers/chairs) that protects steel from rust. Ask for the mill certificaterebar, rebar corrosion
Concrete pourThe truck ticket (class and time), no water added on site; excess water is a main cause of cracking2, and test samples takenready-mix concrete
CuringWetting or covering for 7 days at 10°C or above under the ACI 318 code, as summarised by the FHWA3; stopping and restarting does not complete the period (practical advice)concrete basics
BlockworkManufacturer's test certificates showing block strength meets the ASTM C90 minimum (2,000 psi)4, dimensions, and straight wallsblocks
Services before closing upClear photos with a scale of every wall, ceiling and floor before plastering or boarding, and a pressure test of water pipes before closing (requested by the supervisor)pipes, wires
WaterproofingPhotos of the membrane, and a flood test before tiling while watching the ceiling belowwaterproofing under tiles, roof waterproofing
TilingAdhesive coverage at least 80% in dry interiors and 95% exterior and in showers5; ask for a random tile to be lifted during worktile installation

2) The quality file to keep

  1. The supervisor's sign-off records for each stage (especially rebar before pouring).
  2. Concrete tickets and sample test results.
  3. Manufacturer certificates for rebar, blocks and main materials. See the materials buying checklist.
  4. Photos of services and waterproofing before closing up, organised by room.
  5. Written warranties for waterproofing and equipment.

This file helps at handover, with any later claim, and when selling.

3) When to ask for work to stop and consult the supervisor

  • Pouring without rebar sign-off.
  • Adding water to concrete on site.
  • Closing walls or ceilings before services are photographed.
  • Tiling a bathroom before the flood test.
  • Changing a material or size from the drawings without written approval.

The list is practical advice for owners; technical decisions and approval belong to the supervising engineer under the Saudi Building Code. See the building journey.

Sources

The number next to a statement points to its source in this list. Sources back the general information; anything marked “practical advice” is editorial experience, not a quoted source. Anything that affects safety, structural design or electrical installations needs a licensed professional, and in Saudi Arabia the binding reference is the Saudi Building Code.

  1. 1ASTM A615/A615M — Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement — ASTM International
  2. 2CIP 4 — Cracking Concrete Surfaces — National Ready Mixed Concrete Association (NRMCA)
  3. 3Guide for Curing of Portland Cement Concrete Pavements — U.S. Federal Highway Administration (FHWA)
  4. 4What is the Minimum Required Compressive Strength for Concrete Masonry? (ASTM C90) — Concrete Masonry & Hardscapes Association (CMHA)
  5. 5Never Assume You Have Sufficient Mortar Coverage. Check It. — Ceramic Tile Education Foundation (CTEF)
Was this guide useful?
This guide is for general information and planning, based on standards and technical guides. Standards are revised periodically; in Saudi Arabia the binding reference is the Saudi Building Code and the instructions of the competent authorities. For design and execution, use a licensed engineer or technician. Found an error? Tell us.