Key points
- A good quote is itemised with quantities, specifications and duration, not just a lump sum.
- Tie payments to completed and accepted stages, not dates.
- Inspect hidden work before it's covered, and document it.
- Collect warranties, data sheets and as-built drawings.
Written for:OwnerContractor
This checklist distils the detailed Binaaline guides, organised by project stage. Print or save it and use it with your contractor.
1) Before contracting
- Define the scope of work in writing (what will be removed, installed, and kept).
- Get at least 3 quotes for the same scope so the comparison is fair.
- The quote must state: quantities, material specifications (e.g. BIa porcelain, C2TE S1 adhesive, CG2WA grout, pipes with application class), duration, warranty, and who supplies materials.
- Check the contractor's commercial registration, classification and previous work, and ask for references from past clients.
- Tie payments to completed, accepted stages.
- Agree in writing how extra work and material changes will be handled.
- Check whether municipal permits are needed for the type of work.
2) When materials are delivered
- Match materials against the contract (type, classification, shade and calibre codes for tiles).
- Ask for technical data sheets and certificates of conformity.
- Check expiry dates of adhesive, grout and membranes (cementitious products have a shelf life).
- Store materials away from sun and moisture, especially insulation. See thermal insulation.
3) During the work — hold points and inspections
| Stage | What to check before moving on | Guide |
|---|---|---|
| Water supply | Pressure test, valves, pipe type | Pipes |
| Drainage | Falls, traps, venting, drainage test | Drainage |
| Electrics | Colours, cable sizes, RCD, bathroom zones | Breakers |
| Waterproofing | Corners, outlets, flood test | Waterproofing |
| Tiling | Lift a tile to check coverage, joints, offset | Installation |
| Concrete (if any) | Steel before pouring, samples, curing | Concrete |
4) At handover
- A handover walk-through with a written snag list and a date for fixing it.
- Operate every point: water, drainage, electrics, air conditioning.
- Test the RCDs.
- Check tiles by light tapping, joint alignment and grout cleanliness.
- Collect: warranties, material data sheets, photos of hidden work, the electrical circuit schedule, and spare tiles with the same codes.
- Make the final payment after the snags are fixed.
Was this guide useful?Thank you, your answer was recorded. If you found an error or a gap, report it from the link below.
This guide is for general information and planning, based on standards and technical guides. Standards are revised periodically; in Saudi Arabia the binding reference is the Saudi Building Code and the instructions of the competent authorities. For design and execution, use a licensed engineer or technician. Found an error? Tell us.