Key points

  • Regulatory requirements for commercial buildings vary by activity and come from the competent authority (municipality, civil defence and others), not a general guide.
  • Before a change of use: assess electrical loads, services, drainage and ventilation with a professional, since a new activity may need different loads or services.
  • Shared services (pumps, tanks, main panels, roof) need an owner, a maintenance schedule and a log.
  • Shades on commercial streets have requirements and a permit via Balady.
Written for:OwnerContractor

A commercial building puts different activities under one roof: a restaurant beside a clothes shop with offices above. Each activity has its own loads and requirements, and a fault in a shared part affects everyone.

Important: regulatory requirements (fire safety, licences, health requirements) vary by activity and come from the competent authority. This guide helps you organise the questions; it does not replace checking with them.

1) Before a change of use or letting to a new activity

ItemWhat to assess with a professionalDetails
ElectricsIs the existing capacity enough? Dedicated circuits for large loads? RCD protection?wires, breakers, earthing
Water and drainageWater points, drainage, and grease traps for restaurants per the authority's requirementsdrainage
Cooling and ventilationThe new activity's heat load, and extraction of odours and smokechoosing AC
FloorsSlip resistance, especially in wet areas, and load capacitytile specs
Shopfront and shadesFrontage requirements, and shades on commercial streets with their permit1shades

2) Shared services

  • Pumps, tanks, roof, main panels and exterior lighting: one person responsible, a maintenance schedule and a log. See existing building maintenance.
  • Tanks: cleaning and disinfection when needed and a tight cover2. See water tanks.
  • Automatic doors and gates: reverse test and inspection every 30 days3.
  • Separate meters for each unit where possible reduce disputes (practical advice).

3) Documentation

  1. As-built drawings, and panel and circuit layout for each unit.
  2. Licences and certificates issued for the building and each activity.
  3. Maintenance contracts and inspection reports (electrics, lifts, safety systems where present).
  4. A record of alterations by each tenant, with the owner's written approval.
  5. Warranties. See warranties and spare parts.

4) Tenant alterations

Practical advice: require in the lease that any change to electrics, plumbing or frontage needs written approval and a licensed professional, and that drawings of the change are handed over. Undocumented alterations are a leading cause of faults and disputes at the end of a lease.

Sources

The number next to a statement points to its source in this list. Sources back the general information; anything marked “practical advice” is editorial experience, not a quoted source. Anything that affects safety, structural design or electrical installations needs a licensed professional, and in Saudi Arabia the binding reference is the Saudi Building Code.

  1. 1Car Shades Permit (e-service) — Ministry of Municipalities and Housing
  2. 2Technical Note 3: Cleaning and disinfecting water storage tanks and tankers — World Health Organization (WHO) / WEDC
  3. 3Non-Reversing Automatic Garage Door Openers Are a Hazard (Safety Alert, Pub. 523) — U.S. Consumer Product Safety Commission (CPSC)
Was this guide useful?
This guide is for general information and planning, based on standards and technical guides. Standards are revised periodically; in Saudi Arabia the binding reference is the Saudi Building Code and the instructions of the competent authorities. For design and execution, use a licensed engineer or technician. Found an error? Tell us.